Wind Tree Sculpture & Water Feature – Wynyard Quarter

PROJECT SUMMARY: 

As part of the ongoing development of Auckland’s Wynyard Quarter a water feature was constructed as part of the “Wind Tree” Sculpture that was re-instated from storage. H2O were contracted to provide the detailed design, installation and commissioning of the Water Feature.

CLIENT: Dominion Constructors

PROJECT DETAILS:
The design of the Feature was straight forward with a simple pond like expectation from the Architects. The Water Feature system consists of the following:

  • 2 x Feature pumps with integral inlet strainers
  • Filtration system with Sand Filter and Filter Pump.
  • Automated water chlorination and pH control
  • Automatic mains water make up.
  • Floor sump with submersible pump for flood protection.

The Water Feature was completed to the allocated budget and within the required timeframe. We continue to service and maintain this feature today. As a result of this ongoing service work it was quickly discovered the original filtration system would be unable to cope with the unforeseen dirt loading of the feature due to windblown debris, bird feathers from Seagulls and dirt being carried in from nearby gardens. To overcome this problem a second filter was installed which has resulted in satisfactory operation of the feature.

 

Auckland Art Gallery Refurbishment – Water Features

PROJECT SUMMARY:
As part of the refurbishment of the Auckland Art Gallery three water features where constructed at various locations. H2O were contracted by Hawkins Construction to provide the detailed design, installation and commissioning of the features.

CLIENT: Hawkins Construction

PROJECT DETAILS:
The design and construction of the water features presented a challenge in that the main structure of the facility already existed or space for plantrooms was already allocated requiring lateral thinking around the use of plantroom space, location of reticulation pipework and the construction of surge tanks. Each of the Water Feature systems is independent and typically consists of the following:

Feature pump(s) with integral inlet strainer(s)
Filtration system with Sand Filter and Filter Pump.
Automated water chlorination and pH control
Automatic mains water top up.
Floor sump with submersible pump for flood protection.
The Water Features where completed to the allocated budgets and in the required timeframes during the building construction period.

We continue to service and maintain this feature today.

 

Containerised Dosing Systems – Queensland, Australia

PROJECT SUMMARY: 

As part of to remote water treatment plants in South East Queensland, FSI Engineering was contracted to design and build two identical containerised dosing systems. These systems included the storage, mixing and dosing of Sodium and Magnesium Sulphate into a treated water stream from another part of the treatment plant. Through a long standing relationship H2O Engineering provided specialist design and process engineering services to FSI Engineering for the project including on and offsite commissioning services.

CLIENT: FSI Engineering PTY Ltd (QLD)

PROJECT DETAILS:
As part of our scope we were involved from an early stage in developing the process design of the system through HAZOP studies and

  • Mechanical process and control philosophy design.
  • Detailed mechanical design.
  • Equipment selections.
  • Pre-commissioning and equipment testing.
  • Performance testing.
  • Site commissioning.
  • This project brought together a team of people who had completed several large scale powder storage and dosing systems in Australia over the last 6 years.

 

Completed Dosing System3D Model of Dosing Plant

Inside ContainerEnd View of System

 

Ardmore WTP Powder Activated Carbon Dosing Plant

PROJECT SUMMARY:
As part of the ongoing improvements to the Ardmore WTP, H2O Engineering where contracted to replace the existing Powdered Activated Carbon (PAC) facility with an industry best practice storage and handling facility.
The scope included detailed design, installation and commissioning of the specialist PAC dosing equipment.

CLIENT: Watercare Services Ltd

PROJECT DETAILS:
The unique challenges provided in this project included the need to keep the existing plant operational and the requirement for the new plant to be designed to exceed HSNO Regulation and Hazardous Area Zone electrical requirements for storage and handling of combustible dust.

KEY PARTS OF THE PROJECT WERE:

  • Dose rates ranging from 25-480kg/hr of dry powder
  • Twin dosing trains each with 15m3 powder storage
  • Zone 22 Explosive Dust rating requirements
  • Flexicon Bulk Bag Unloaders and WAM Materials Handling equipment incorporated into plant design
  • Demolition of redundant equipment

Detailed planning was needed to ensure project targets were met. Working with the clients engineering consultants, Mechanical Technology Ltd., the new plant was available for dosing within six months from H2O’s contract award with only one week without PAC dosing capability.

 

Glenfield Learner Pool Filtration Upgrade

PROJECT SUMMARY:
H2O Engineering was awarded the contract to undertake upgrade work at Glenfield Leisure Centre to the Learner Pool Filtration and Heating Plant, repairs to the Main Pool VDE Filter Tank and conversion of the Chemical Dosing System from Chlorine Gas to Sodium Hypochlorite including a pH correction system using CO2 Gas.

CLIENT: Auckland Council

PROJECT DETAILS:
This presented a unique challenge due to the requirement to carry out the installation in a tight time frame to coincide with the planed pool shut down. Also there was a requirement that the primary heating water circuit was kept running to provide heating for the air handling system.

KEY ASPECTS OF THE PROJECT:
Main Pool Filter Repairs

Remove all filter internals and water blast and wash internal surface
Patch repair damaged concrete
Coat internal surfaces with 3-coat epoxy paint system
Re-instate and repair where necessary filter components
Learner Pool Heating System

Dismantle existing Secondary (Pool Water) Heating pipework and booster pumps
Remove all redundant heating pipework
Re-install Booster Pumps and install new Secondary Heating Pipework
Learner Pool Filtration Upgrade
Supply, install and commission a new Pressure DE Filter and Filter Pump including modifications to pipework.
Modify connections for mains water make-up, heating and chemical injection connections.

Chemical Dosing System Modifications

Disconnect and remove Chlorine Gas Storage and Dosing Equipment
Supply and Install a new 4500L Sodium Hypochlorite Storage Tank and new Dosing Pumps for the Main and Learner Pools
installation of a CO2 Dosing and Storage System including Bottle Cage, Auto Change-over System, Distribution Panel and Injection Diffusers.

All the works were completed within the available time frame in 2012.

 

 

Auckland Zoo – Te Wao Nui Area Project

PROJECT SUMMARY:
As part of the new Te Wao Nui area at the Auckland Zoo, H2O Engineering was awarded the contract to undertake Water Treatment and Reticulation work for the various exhibits that make up this new part of the Zoo. The scope for this project included detailed design, installation and commissioning of each of the various systems.

CLIENT: NZ Strong Construction

PROJECT DETAILS:

  • The project was split up into five key areas: Wetlands
  • This section included Reticulation for the Main Pond, Water Fall, Water Treatment Plant and Reticulation for the Eel Tank and a Misting System.
  • Eel Tank treatment comprises of 2 x Sand Filters and a UV Disinfection system and De-Gasser. Night Forest This area comprised of an Aged Water System, Night Stream Reticulation, Giant Kokopu Tank and Kiwi Enclosure Water Features. High Country
    Included in this area are the Reticulation Systems for the Blue Duck and Kea Streams Island Sanctuary
    This exhibit comprises of a Stream System for the Island Sanctuary and a small Pond and Stream for the Tuatara exhibit.
  • Non-Potable Water Treatment Plant
    This part of the project required the partial demolition of an existing plant, installation of a Pre-Filter, 2 x Sand Filters and a UV Disinfection system along with re-instatement of Depth Filtration/Softener Plant. These systems are used to treat water from the on-site bore and water extracted from Western Springs.
  • All the contracted works were completed on time and budget during construction works for the new exhibits in 2011.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Chemical Dosing Systems

Chemical dosing system alternate name chemical water treatment for cooling water, chemical water treatment for chilled water.

Chemical dosing system is widely applied in corrosion, scale inhibition, sterilization and algae removal of the circuiting water systems such as air-conditioning cooling water, chilled water, ice storage, etc.The chemical dosing system can also achieve the effect equivalent to the electronic descaling instrument.In the process of air conditioning circulating water and various purified water, the water quality always decides if the system can run efficiently for a long time.

Aquatic Filtration Systems

One of the most evident effects of a dirty swimming pool or hot tub filter is cloudy water. When the filter becomes clogged the pool water circulation decreases. Without the right water movement, more chemicals are used to maintain clear and enjoyable pool water. Eventually, even the extra chemicals will no longer effectively keep the water clean. As the pressure builds up inside the filter, the pool vacuum will also stop functioning.

Pure Water Treatment

Wherever your raw water comes from; Well, borehole, surface water, river water, sea water, recycled waste streams or potable water from the municipal supply, good pre-treatment is essential to protect your downstream processes and save costs.

Raw water often contains a wide range of water contaminants such as suspended solids, organics, hardness, heavy metals such as manganese, iron, lead and arsenic. All of which must be removed or reduced before introducing the water into your processes.

Water Features

Our Water Features will enhance and transform any home or outdoor space and range from contemporary stainless steel designs to the more traditional so you’re bound to find your ideal water feature here with us.

To make life easier, the majority of our water features are self-contained, easy to install and require very little maintenance. In fact, you could say, that the hardest part is deciding which to choose! Solar Water Features are now a very popular choice with our customers and use the natural power of the sun

 

H2O has been servicing many water features since it’s inception in 2007, we have also continued on to completing the detailed design and construction of water features throughout the country. If you have a water feature and would like to discuss the design and construction then call us.

 